Planning applications, drawings and Building Control in London

Planning applications, technical drawings and Building Regulations approval, prepared in-house across London and the South East, with viability tested before design fees are committed.

Why clients appoint Baclands

  • 01

    Prepared in-house, by one team

    Planning applications, technical drawings and Building Regulations packages are prepared together, so nothing is lost between consultants and the design that is approved is the design that is built.

  • 02

    Drawn from a measured survey

    Existing and proposed plans, sections and elevations are drawn to scale from a measured survey of the building, so every proposal starts from accurate information.

  • 03

    Viability tested first

    Build cost, fees, finance and end value are appraised before design fees are committed, with the source of every figure shown.

  • 04

    Every detail traced to the regulations

    Each wall, floor, roof and junction build-up is traced to the Approved Document it satisfies, ready for Building Control full plans approval.

  1. 01SurveyMeasured survey and site constraints
  2. 02FeasibilityAppraisal and planning strategy
  3. 03PlanningApplication prepared, submitted and managed
  4. 04Technical designDrawings, details and specifications
  5. 05ApprovalBuilding Control full plans approval
  6. 06TenderInformation to price and build from

What we cover

Planning applications

Full, householder, change of use, prior approval and listed building applications, managed from pre-application advice to decision and the discharge of conditions. Each scheme is tested against the NPPF and the local plan before it is submitted.

Permitted development

Permitted development rights are checked before any application is made, and lawful development certificates are obtained where the rights apply.

Technical drawings

Measured existing drawings, and proposed plans, sections and elevations drawn to scale, issued under revision control as the design develops.

Building Regulations approval

Full plans packages prepared to the Approved Documents, with wall, floor, roof and junction build-ups each traced to the requirement it satisfies, and officer comments answered with revised drawings.

Development appraisal

Build cost, fees, finance and end value set out in one model, so the viability of a scheme is clear before money is committed to design.

Fire, acoustic, ventilation and drainage

Specialist strategies prepared with consultants and carried through to Building Control, including drainage to Approved Document H and soakaway strategies.

Listed buildings and conservation areas

Heritage significance assessed and protected in the design, with listed building consent sought alongside the planning application where it is required.

Principal designer and party wall

Pre-construction health and safety coordinated under the CDM Regulations 2015, and Party Wall notices and agreements prepared where work affects a neighbour.

We work for homeowners, landlords, developers, investors, landowners and housing providers across London and the South East.

Standards and regulations we work to

  • National and local planning policySchemes tested against the NPPF and the local plan before submission.
  • Permitted development (GPDO 2015)Rights confirmed, and lawful development certificates obtained, before any application.
  • Approved Documents A to SEvery build-up and detail traced to the requirement it satisfies.
  • CDM Regulations 2015Principal designer duties through the pre-construction phase.
  • Party Wall etc. Act 1996Notices and agreements prepared for work affecting neighbours.
  • Listed building and conservation consentHeritage significance assessed and protected in the design.

Frequently asked questions

Do I need planning permission?

Not always. Many alterations and extensions fall under permitted development. We check your rights before any application is made and, where they apply, obtain a lawful development certificate so the position is confirmed in writing.

How long does planning take?

Councils aim to decide most applications within 8 weeks, and major schemes within 13. Wherever possible we begin with pre-application advice: in our experience it helps a scheme move faster and builds a working relationship with the planning officer from the start.

How much do drawings and applications cost?

It depends on the scope. We can price the full design and approvals process as one fixed fee, from survey to approval, or price individual stages. Either way, the cost is set out in writing before any work begins.

What happens if my application is refused?

We review the reasons for refusal with you and advise on the best route forward, whether that is a revised application addressing the council's concerns or another route. Resubmissions are managed by the same team.

What is the difference between planning permission and Building Regulations approval?

Planning permission decides whether a development is acceptable, looking at its use, appearance and impact on the area. Building Regulations approval confirms it will be built safely, covering structure, fire safety, insulation, ventilation and drainage. Most projects need both, and we prepare both.