Our first Carbon Reduction Plan
We have published our first Carbon Reduction Plan, with a measured baseline and a commitment to reach Net Zero by 2050 at the latest.
Read moreLaunching our Building Regulations series
A long-running series of plain-language guides to the Approved Documents, each built around a step-by-step 3D model of the construction it describes.
Read moreFlat roof remediation and water ingress investigation
An investigation-led remediation of persistent water ingress through the flat roof of a commercial building, locating the defect precisely before any intrusive work began.
Read moreElectrical reinstatement of a fire-damaged residential block
Full electrical reinstatement of a residential block after a fire, delivered in nine days from initial survey to certified handover.
Read moreMoving local logistics to electric vehicles
As part of our commitment to cutting operational emissions, local deliveries and collections now run on electric vans wherever practical.
Read moreHeritage consultancy on a Grade II listed civic building
Technical and regulatory consultancy on proposed works to a Grade II listed civic building.
Read moreMeasured surveys in 3D
We now capture buildings with a Matterport 3D camera: one visit gives you measured plans, a walk-through tour and a dated condition record.
Read moreOffice-to-residential conversion under way
Baclands has begun a full design-and-build conversion of a commercial office building into new homes, from planning through to completion.
Read more