Reuse first. Order to measure. Report to your standard.

Most of our work is refurbishment, conversion and repair, so the building is already standing. We keep what performs, order materials from a measured survey, and provide the environmental records your contract asks for, in the format it asks for them.

Built into how we work

Four practices that run through our projects, each one leaving a record you can check.

Repair before replacing

Existing structure, fabric and fittings stay wherever they still perform. We remove only what condition or the design requires.

RecordCondition record from the measured survey

Order to measure

Quantities come from the 3D measured survey rather than estimates, so materials arrive in the right sizes and numbers, and less of them is wasted.

RecordQuantity schedule checked against the survey

Waste handled lawfully

Waste is separated on site and removed by licensed carriers, with a transfer note kept for every load.

RecordTransfer notes and the site waste log

Fabric first

Energy upgrades start with insulation, draught-proofing and glazing, then heating, controls and lighting. It is the order we follow in the homes we let.

RecordInstalled measures listed in the handover file

Energy upgrades for rented homes and commercial space

The government has confirmed that privately rented homes in England and Wales must reach EPC C by 1 October 2030, with landlords required to spend up to £10,000 per property. Minimum standards for commercial lettings are expected to rise as well.

We start from a measured survey, rank the measures by cost and effect on the rating, carry out the works and have the new certificate lodged. It is the same process we use on the homes we let.

  • Assessment from the 3D survey, so measures are sized to the building
  • Measures ranked by cost and effect on the rating, within the cost cap
  • Fabric first, then heating, controls and lighting, with ventilation designed in
  • New EPC lodged by an accredited assessor at completion
Energy efficiency ratingBeforeAfter

Very energy efficient: lower running costs

92+A
81–91B
69–80C
55–68D
39–54E
21–38F
1–20G
47 E
71 C

Not energy efficient: higher running costs

Typical measures, in order

  1. Loft and wall insulationFabric
  2. Draught-proofing and glazingFabric
  3. Heating controls and efficient heatingServices
  4. LED lightingServices
Illustrative rating improvement for a rented homeMeasures sized from the survey

Reporting to your standard

Not every contract needs the same records. Choose what yours requires from the schedule below: we agree it at tender, price it in the bid and deliver it in your format.

Discuss your requirements
What you receiveWhenStandard
Waste and resources
Site waste management planWaste streams, quantities and destinations, agreed with youBefore work startsClient or BREEAM targets
Transfer and consignment notesA note for every load that leaves siteEvery loadEnvironmental Protection Act 1990, s.34; Hazardous Waste Regulations 2005
Recycling and diversion figuresTonnage and the share recycled or recovered, from the carriers’ returnsMonthly or at handoverWaste (England and Wales) Regulations 2011
Asbestos and hazardous materialsSurveyed before work, removed by licensed specialistsBefore and during worksControl of Asbestos Regulations 2012
Materials and products
Certified timberChain-of-custody certificates for timber and timber productsAt handoverFSC or PEFC
Product data and declarationsData sheets, and environmental product declarations where publishedAt handoverBS EN 15804
Responsible sourcingSupplier certifications and origin information, where specifiedAt handoverBES 6001
Energy and carbon
Building to a rating targetEPC, SAP, BREEAM or Part L targets carried through the specification and the buildThroughoutApproved Documents L and F
Before and after EPCsAssessed and lodged by accredited energy assessorsStart and completionEnergy Performance of Buildings Regulations 2012
Commissioning and test certificatesHeating commissioning, air tests and electrical certificatesAt completionApproved Document L; BS 7671
Site energy and waterMeter readings for site energy and water useMonthlyBREEAM responsible construction
Embodied carbonAssessment arranged with specialist assessorsWhere the contract requiresRICS whole life carbon assessment
Site and community
Considerate ConstructorsSite registered with the SchemeFor the contract termCode of Considerate Practice
Dust, noise and working hoursControls agreed with the council, with monitoring where requiredBefore work startsControl of Pollution Act 1974, s.60 and s.61; Mayor of London dust guidance
Neighbour liaisonAdvance letters, a named contact and a log of concerns raised and resolvedThroughoutPlanning conditions and construction management plans
Social value returnsLocal labour and spend, reported in the council’s own frameworkAs the contract setsPublic Services (Social Value) Act 2012

Our commitments

Company policy and carbon reporting, reviewed every year.

Policy

Environmental and Sustainability Policy

How we manage waste, materials, energy and site impacts, who is responsible, and how the policy is reviewed.

Read the policy
Carbon reporting

Carbon Reduction Plan

Our company emissions for the year to 30 June 2026, measured to the government’s PPN 006 standard, with reduction targets and a commitment to net zero by 2050. Updated every year.

Read the plan

Tell us about the building.

Send an address and a line about what you need. We aim to reply within one working day to discuss the next step and arrange a site visit where needed.